Skip to content
Skykam

UK coverage · Midlands

Drone surveys across the Midlands

From logistics platforms along the M1 and M6 to hard-rock quarries and former coalfield land, survey-grade aerial data for the country's busiest development corridor.

01Surveying in Midlands

Development at scale in the middle of England

The Midlands combines some of the UK's largest development sites with some of its most heavily worked ground. Big-box logistics around the M1, M6 and M69, often called the Golden Triangle, needs large, level platforms, which means substantial earthworks and a steady demand for pre-construction topography and monthly cut and fill quantities. The HS2 route, strategic housing allocations and highway improvements add to the pipeline, while the former coalfields of Nottinghamshire, Derbyshire and Staffordshire bring reclamation sites with old spoil heaps, settlement and uncertain levels.

It is also a major minerals region. Leicestershire's igneous rock quarries around Mountsorrel, Bardon Hill and Croft are among the largest hard-rock operations in England, the White Peak around Buxton supplies limestone for aggregates and industry, and the Trent Valley has long been worked for sand and gravel. Faces, tips, silt lagoons and restoration areas all benefit from aerial capture, keeping surveyors away from edges and haul roads.

Energy sites are changing too. With coal-fired generation at Ratcliffe-on-Soar ended in 2024, former power station land, solar farms and battery storage projects across Lincolnshire, Leicestershire and Nottinghamshire are generating demand for topographic and corridor surveys for layouts and grid connections.

  • Logistics and industrial platforms: pre-design topography and earthworks quantities
  • Hard-rock, limestone and sand and gravel quarries: stock, faces and extraction
  • Former coalfield and brownfield reclamation: ground models and spoil volumes
  • Floodplain modelling on the Trent, Severn, Avon and Soar
  • Solar, battery storage and grid connection routes in the East Midlands

02Airspace & permissions

We handle the permissions.

Every site is checked against current airspace data and restrictions before we quote a date. Where approvals are needed, we apply for them.
  • Birmingham Airport and East Midlands Airport each sit within a Class D control zone and a Flight Restriction Zone. Sites near either, including parts of Solihull, the NEC area, Castle Donington and the M1 corridor near junctions 23A to 24, need air traffic control permission.
  • Flight Restriction Zones cover the aerodrome traffic zone plus runway protection zones extending 5 km from each runway threshold, so the restriction can reach well beyond the airport boundary along the approach and climb-out paths.
  • RAF Shawbury in Shropshire is a busy military helicopter training base, and RAF Cosford also operates in the West Midlands. Military aerodromes have their own protected zones, and low-level rotary traffic around them needs particular attention in flight planning.
  • Gliding sites, microlight strips and smaller licensed aerodromes are scattered across the region. We identify them at planning stage and notify operators where our flights are close by.
  • Much of the Peak District is exposed upland where wind at altitude can be significantly stronger than at ground level. Quarry and moorland sites are flown in suitable weather windows, with contingency days built into the programme.

Yes, with air traffic control permission. Both airports have Flight Restriction Zones and Class D control zones that extend some distance from the runways. We check every site against them when we quote and apply for permission as soon as we are instructed.

A large, open greenfield site can usually be captured in one or two days, with CAD deliverables typically following in around five working days. Our crews travel nationwide, so mobilisation depends mainly on permissions and weather rather than where in the Midlands the site is.

Yes. We schedule around your blasting programme, stay outside the exclusion zone and never fly during a shot. Monthly stock and extraction surveys are planned to fit production, not stop it.

That is one of the strongest cases for aerial survey. Spoil heaps, unstable slopes, old lagoons and overgrown areas can be captured without anyone walking them, and LiDAR provides a ground model under scrub where photogrammetry cannot see the surface.

We do not depend on regional offices. Our crews are mobile and cover the whole of the UK, and the central location of the Midlands makes it one of the quickest regions for us to reach.

Start a project

Tell us the outcome. We’ll specify the survey.

  1. 01We aim to reply within one hourA drone surveyor, not a salesperson, reviews your brief and calls if anything needs clarifying.
  2. 02Fixed quote & method statementScope, accuracy specification, deliverables, programme and RAMS — in writing.
  3. 03Fly, process, deliverCapture on your programme, then CAD-ready data with a verified accuracy report.
Get a quote